Grupo de Santiago Building (Burgos)

Renault, Dacia, Nissan and Mazda Car Dealership

HVAC Control System and BMS

HVAC System consists of the following equipment and elements:

  • 2 Convention boilers with natural gas burners.
  • 4 heating circuits , with pump and 3-way valve + 1 DHW circuit with pump and tank.
  • 15 heating and cooling areas with valve and 1-wire temperature probes.
  • 1 chiller with built-in pump.
  • 1 radiant panels system.
  • 2 Roof-Top, heat pump, with supplementary heating coil.

Technologies used:

  • Wago-I/O-System PFC200 Controller
  • 1-wire and Pt100 Temperatures Probes
  • Modbus Commutication Protocol.

Edificio Grupo de Santiago (Burgos)

Concesionario Renault, Dacia, Nissan y Mazda

Sistema de Control de la Climatización y Gestión Centralizada

Instalación de Climatización formada por los siguientes equipos y elementos:

  • 2 Calderas Convencionales con quemadores de Gas Natural.
  • 4 Circuitos de distribución de agua de calefacción, cada uno con una bomba y válvula de 3 vías + 1 Circuito de ACS con bomba e interacumulador en la propia sala.
  • 15 zonas sectorizadas de calefacción y frío con válvula de corte con sondas de temperatura 1-wire.
  • 1 enfriadora con bomba incorporada.
  • 1 sistema de paneles radiantes.
  • 2 RoofTop, bomba de calor, con batería de calor de agua suplementaria.

Tecnologías utilizadas:

  • Controlador Wago-I/O-System PFC200
  • Sondas de temperatura 1-wire y Pt100
  • Protocolos de comunicaciones Modbus.

Monitorizacion del COP de un enfriadora de una Industria

Monitorización del COP de una enfriadora Carrier de una planta industrial.

Las herramientas utilizadas han sido PilotE² Cooling Analyzer y DEXCell Energy Manager.

Grafica Energía Grafica de caudal

 

Renedo de Piélagos Indoor Swimming Pool

PilotE² EcoSystem has been installed in the boiler room for a week, consisting of:

  • Central Unit PilotE² Portable
  • One heat meter with non-invasive ultrasonic flowmeter PilotE² Heatmeter
  • Contact temperature probes
  • Gas volume totalizer with pulser

So we have a “video” with real-time access via 3G communications with:

  • Flow rates, temperatures and powers
  • Energy submetering
  • Seasonal performance, considering that it has only been a week
  • Number of daily starts/ stops
  • Operation hours
  • Malfunctions

Public School María Sanz de Sautuola

It is a part of Energy Efficiency Plan of Santander City Hall consisting 72 building energy audits (including 33 public schools) and 22,000  municipal light points. PilotE² EcoSystem has been installed in the boiler room, consisting of:

  • Central Unit PilotE² Portable
  • Two heat meters with non-invasive ultrasonic flowmeter PilotE² Heatmeter
  • Contact temperature probes
  • Gas volume totalizer with pulser

So we have a “video” with real-time access via 3G communications with:

  • Flow rates, temperatures and powers
  • Energy submetering
  • Seasonal performance, considering that it has only been a week
  • Number of daily starts/ stops
  • Operation hours
  • Malfunctions

KDK Dongkook Automotive Spain S.A.

Industrial plant boiler room monitoring with PilotE² EcoSystem http://www.kdkautomotive.com/en/locations/borja